Commercial solar planning · Churches and worship facilities
Solar for Tennessee Churches and Worship Facilities
Before a church asks how many panels will fit, it helps to ask when the building actually uses electricity and whether the roof is ready. Use this board planning packet to collect the right bills, compare written scopes and decide whether to request a site assessment, wait for planned roof work or do more homework first.
Start with one decision for the board
At the first meeting, the question is usually not “Should we buy solar?” It’s “Do we have enough information to price the right project?” Decide whether the goal is buying less electricity, acting on a stewardship commitment, coordinating a planned roof replacement, or exploring outage backup for specific activities. Those goals may lead to different scopes. Name the person who can gather utility data and the person who can speak for the building and roof.
One property does not always mean one electric bill. A sanctuary, classrooms and a separate fellowship hall may have different schedules or service accounts. Record which meter supplies which space before a bidder models the whole campus as though it ran on one account.
Why Sunday and weekday electricity use need separate attention
Some facilities use most of their electricity around worship and events. Others also have a weekday school, offices, a community kitchen or rented rooms. Compare operating hours, heating and cooling schedules, and whether equipment runs while a proposed array would be producing. A board can see the annual electricity total on bills without being able to tell from that total when the building used it.
Bring at least 12 months of available bills for the meters in scope and ask the account holder for interval usage data if it’s available. Note unusual months, planned additions, changes in facility use and upcoming equipment replacements. For help collecting a baseline, the EPA’s ENERGY STAR Worship Facilities Toolkit includes walkthrough and energy-data worksheets. Compare the actual tariff and serving utility before accepting an estimate of purchased power, billed demand or export compensation.
Put the roof plan next to the solar plan
Bring the roof age by building, whatever warranty paperwork you have, known leak or repair history and the facilities budget for upcoming roof work. If the roof is due soon, price the solar work and roof work as separate line items even if both will be coordinated. Ask who checks the structure, who can approve attachment details, and how your building can be maintained and reroofed later.
A backup request is a separate question from daytime energy savings. If the board wants a communications room, refrigeration, certain lights or another designated load to remain powered, name those loads up front. Ask bidders to specify which circuits the design can support, how it would be tested and what assumptions affect runtime. A bid for ordinary grid-connected solar is not a promise that the building stays powered during an outage. See energy storage options and the Department of Energy’s solar resilience guide.
Printable board checklist: before you request bids
Print or save this section with your meeting notes. Check an item off when the information is collected, or write down who will get it before the next meeting.
- ☐ Write the project goal and identify the person who will bring it back to the board.
- ☐ Confirm the property owner or authorized representative, the facilities contact and the account holder for each meter.
- ☐ Collect a year of bills per relevant meter, available interval data and a typical operating schedule.
- ☐ Record roof age, repair history, warranty contacts and planned construction or roof work.
- ☐ List the equipment that must stay on during outages, if backup is part of the discussion.
- ☐ Ask each bidder to separate panel work, roof work, electrical upgrades, permits and utility coordination, monitoring, and any battery option.
- ☐ Compare array size, modeled generation, estimated electricity used on site, export assumptions, and charges that could remain. Keep estimates separate from guarantees.
- ☐ Confirm the decision owner, the proposed funding source and the questions to take to your own financial or legal adviser. Don’t build the decision around an incentive before eligibility is verified.
Decide what comes next
Request a site review when the goals, roof and account contacts are clear. Gather more information when meter responsibilities or usage are unclear. Coordinate with the roof plan first when the building already has a near-term replacement or repair decision.
Bring the checklist to a solar conversation
The Solar Roofers describes its work with nonprofit facilities on the commercial solar design and installation page. When contacting the team, identify your site, the utility, what’s on the board agenda and whether you are gathering information or ready to price a defined scope. If the project starts with an aging building, see roof preparation for commercial solar.