Power planning · Detached shops and remote properties

Run Utility Power to the Shop, or Build an Off-Grid System?

Start by asking what kind of grid connection is possible. Feeding a shop from an existing house service, adding a separate utility service and running a standalone solar system are three different projects. Price the options around the same loads, especially what has to run in winter.

Price three paths, not just panels versus a power line

What to ask for when pricing power for a detached shop
OptionWhen to look at itWhat to request in writing
Feeder from an existing serviceThere is already service on the property and it may have capacity for the shop.An electrician’s assessment of available capacity, route, site work, permits and limits on future loads.
New utility service or line extensionThere is no usable existing service, or the shop needs a separate service.Utility construction and owner costs, meter location, easements, timing, and which portions the utility and owner each cover.
Standalone solar with storageThe site has usable sun, the loads can be defined and a grid option is unavailable or not preferred.Array, inverter, usable storage, winter assumptions, what happens after poor production days and any approved backup plan.

If the utility supplies the site, speak with it before finalizing the building location or a trench. Middle Tennessee Electric’s construction standards, for example, explain that easements, inspections and line extension fees can affect a project. Confirm the current requirements and written costs with the utility that actually serves the site. A line visible along the road does not tell you where or on what terms the utility will deliver service.

Write down what the shop needs to run

Put each load on a list: lighting, vehicle chargers, ventilation, a well pump, compressor, workshop tools, refrigeration and space heating or cooling, if applicable. Record the equipment model if you already know it, when it runs, how long it runs, and whether other equipment runs at the same time. Consider occasional loads and future purchases, not just what will be plugged in on the first day. Do not open equipment or electrical panels to find information; collect records and safe, visible labels and have a professional verify the load.

Two numbers are especially important. Power, in kW, describes how much the equipment demands at once. Energy, in kWh, describes how much it uses over time. A hypothetical 2 kW load running steadily for three hours uses 6 kWh before system losses. An equipment startup surge is a separate capacity consideration. This arithmetic is not a recommendation for an inverter or battery size.

A shop used on sunny afternoons is not the same as a building expected to run refrigeration overnight or heat equipment every winter morning. Ask the designer for a worst-season scenario, storage limits, the loads they assume can be deferred, and what the system can do after several cloudy days. The PVWatts estimator can help illustrate seasonal solar output, but an annual generation estimate does not verify standalone reliability. That requires a site-specific load and storage assessment.

What one 16 kW off-grid quote actually covered

A historical 16 kW off-grid design quoted $14,875 for installation labor and listed remaining materials. The owner was to supply the array, racking, inverter and controller, and two batteries. Battery capacity was not specified; no load study or verified runtime accompanied the estimate.

The $14,875 was not a turnkey package price and does not establish what was installed or how it performed. It shows why you should compare the full written scope, not just the number on the installer’s labor line. Verify who owns warranty support when the equipment and installation are purchased separately.

Compare the whole cost and the operating tradeoffs

Keep one-time construction and ongoing operation in separate columns. For a feeder or new utility service, list site restoration, equipment on the owner's side of the service point and the cost of ongoing power. For standalone solar, list the whole installed system, any fuel or planned service, future battery or inverter replacement assumptions, and what has to happen when a key component fails. Ask which costs are included, estimated or left for someone else.

Timing matters too. A utility extension may need a utility design, a route agreement and inspections. A standalone design still needs equipment confirmation, a suitable site and any required review. Do not assume one option can be built sooner until the parties responsible have given you a schedule.

Which option should you price first?

If an existing service and a workable route are available, start with an electrician’s assessment and a written cost. If there is no usable service, request a utility estimate and talk through the actual loads with a standalone-system designer. If you plan to connect a system to utility power later, say so up front; equipment, electrical design and approvals may change. A standalone design is not automatically approved for a future grid connection.

Bring a site sketch, the best utility or electrician estimate you have, the location of any existing meter, and the load list. For array placement, compare ground-mounted solar or solar for Tennessee barns and shops. Talk through your property’s options before you buy equipment or settle on a building location.