Commercial solar planning · Landlords and tenants

Solar for Leased Commercial Buildings in Tennessee

When the tenant pays the electric bill and the property owner controls the roof, a solar project needs more than a good layout. Identify the exact roof area, the utility account serving the intended load, and who can approve the work before anyone relies on a savings estimate. Use this planning guide to get the right people and documents into the same conversation.

Who controls the roof, and who pays for power?

Those roles may be held by different people. The building owner may have a capital budget and a roof warranty, while a retail tenant pays its own utility bill. In a multitenant property, the landlord may pay for parking lights and shared mechanical loads, while each suite has a separate account. A solar proposal should tell you which electrical service it is modeled against before it tells you how much the project might offset.

The Department of Energy’s commercial solar resources identify owner and tenant coordination as an important consideration on leased buildings. The equipment layout and electricity model can be scoped by the solar team; the lease, project approvals and how parties share costs belong with the parties and their advisers.

Build a responsibility map before asking for a design

Fill in names or roles for your actual property. This is a planning matrix, not a default allocation of rights, utility charges, or contract obligations.

One roof, four questions to resolve
DecisionStart withDocument or answer to bring
Roof and accessProperty owner and facilities contactRoof age and warranty documents, planned work, proposed area, roof access and who can approve structural review and attachments.
Utility account and meterAuthorized account holder and serving utilityWhich meter serves the proposed load, who can release interval data, and any service boundaries or interconnection constraints.
Project approval and fundingPerson authorized to sign or approve the workProperty owner approval process, tenant involvement, who requests bids and what the controlling documents and advisers require.
Operational benefit and supportOwner, tenant and facilities team togetherWho expects a billing change from the targeted meter, who oversees monitoring, and who responds to service or roof work.

Example: the parking lights and the storefront are on different accounts

Hypothetical property, not a case study: A landlord pays a common-area account. A restaurant tenant has a separate meter for kitchen and refrigeration loads. A design modeled against the landlord’s meter should not also count the restaurant’s load as electricity offset at that meter. If the parties want to target the restaurant account instead, define that as a separate design scenario and verify the site’s electrical and utility arrangements before assuming it can work.

For a property with one billed service, verify how the site is metered and how the parties handle electricity charges rather than assuming the bill is split in any particular way. For multiple services, prepare a meter list, typical operating hours and authorized usage data for each candidate. Confirm the existing rate schedule and any utility program terms against that specific site. For example, Nashville Electric Service’s renewable energy information is a starting point only where NES serves the building.

What to request in a proposal for a leased property

  • A layout tied to the building. Identify the roof being used, roof condition assumptions, access, and any schedule dependency on the building owner’s maintenance plans.
  • A model tied to a named service. Ask which utility meter and usage were modeled; distinguish estimated solar production from energy used on site, exports and changes in specific charges.
  • A list of approvals and open questions. Name who will work with the utility, confirm permit responsibilities and coordinate with other authorized parties before construction.
  • A written support scope. Identify responsibilities for monitoring, service access and possible removal for future roof work. Ask what would need to be reviewed if a tenant or property owner changes.

A shared planning worksheet cannot tell you whether a lease authorizes construction, how benefits must be allocated or whether any incentives apply. Share the relevant questions with your own advisers before pricing a project that depends on those assumptions.

Bring the roof and meter information to the first call

Start with the building location, the proposed roof area, the building and utility contacts, and the intended electrical load. Mention any pending reroof, vacancy or change in usage. See commercial solar installation in Nashville and Tennessee and commercial roof preparation for how those work scopes fit together.