Spring Hill, Tennessee · Historical home solar options
Six ways to quote solar, battery backup or a solar roof in Spring Hill
One home received six different choices. Some added a battery without panels, some put standard panels on the roof, and two replaced the roof covering with integrated solar tiles. The prices from $20,000 to $132,500 were alternatives for one property, not cumulative costs or six installations.
- Alternatives for one property
- 6 configurations
- 30 × 440 W modules in the two standard rooftop options
- 13.2 kW DC
- Historical prices, not current offers
- $20,000 to $132,500
How did the six choices compare?
The practical choice was not just how many panels to buy. It was whether to add outage backup alone, mount panels on the existing roof, or replace the roof covering with tiles that also generate power.
| Choice | Scope | Solar size | Storage specified | Roof tear-off | Quote | Deposit | At completion |
|---|---|---|---|---|---|---|---|
| A | Battery only | No new solar | One Powerwall 3 | No | $20,000 | $10,000 | $10,000 |
| B | Battery plus expansion | No new solar | One Powerwall 3, one expansion | No | $25,000 | $12,500 | $12,500 |
| C | Standard rooftop solar and battery | 13.2 kW DC | One Powerwall 3 | No | $45,000 | $22,500 | $22,500 |
| D | Standard rooftop solar, battery and expansion | 13.2 kW DC | One Powerwall 3, one expansion | No | $49,050 | $24,525 | $24,525 |
| E | Integrated Tesla Solar Roof | Pending final design | No battery in this option | Yes | $112,500 | $56,250 | $56,250 |
| F | Integrated Tesla Solar Roof and battery | Pending final design | One Powerwall 3 | Yes | $132,500 | $66,250 | $66,250 |
The quoting terms contemplated 50% on execution and 50% upon completion. A separate unsigned turnkey form priced Option D at the same $49,050 and $24,525 each installment, which corroborates the configuration and price but does not establish the homeowner chose it.
What was different about the equipment?
| Feature | Quoted design detail |
|---|---|
| Standard array for C and D | Thirty Seraphim SRP-440-BMA-BG bifacial modules at 440 W each, equivalent to 13.2 kW DC, mounted on rails. |
| Storage | Each specified Powerwall 3 and expansion unit was listed at 13.5 kWh. Options B and D total 27 kWh by nameplate arithmetic, not measured usable energy or runtime. Expansion adds storage, not an additional full inverter. |
| Integrated Tesla Solar Roof | Solar glass roof tiles replace the existing roof covering in E and F. Exact generating tile count and system size depend on final design and survey, so no figure is presented. |
| Roof conditions | The roof replacement options included tear-off, but structural framing, deteriorated sheathing and decking replacement were excluded unless approved separately. Standard rooftop options did not include roof replacement. |
| Contractor obligations if selected | Mounting or integrated roof work, electrical integration, testing, commissioning and coordination of permitting, inspection and interconnection as applicable. Permit fees were separate unless included in writing. |
What the record does not say
Both local agreement copies have blank signatures. No payments, purchase decision, completed installation, independent utility approval, monthly energy estimate, annual offset, battery runtime, savings or project photos were verified.
The proposal allowed around two to three weeks for design and permitting and another three to five for ordering and installation. Those were scheduling estimates, not an actual timeline. Warranty terms varied by equipment and installation scope and are not a promise of output.
These numbers explain how the scopes compare, not what another property should pay. Assess roof life, backup loads, site conditions, permitting and interconnection before choosing between options.
Decide what you want the system to do first
Start with the circuits you want available in an outage and the remaining life of the roof. Then request comparable scopes with equipment, exclusions and installation responsibilities written out.
Compare solar and battery options for your homeSource: Anonymized The Metal Roofers six-option proposal and separate Option D turnkey agreement form. Both signatures blank. Historical choices for one site.