Nashville, Tennessee · Historical rooftop solar and backup proposal

A 17 kW solar, battery and generator proposal for a Nashville home

A Nashville homeowner's 17 kW proposal paired forty rooftop panels with four EG4 batteries and a separate generator line. The $111,040 cash quote included $20,000 for the generator item. It was a modeled design for a specific property, not a verified installation or operating result.

40 × 425 W modules
17.0 kW DC
4 × 14.3 kWh EG4 battery units
57.2 kWh nominal
$91,040 system + $20,000 generator
$111,040 quoted

What equipment was proposed?

The roof model allocated 29 modules to a 190° azimuth and 11 to a 100° azimuth, both on a 27° slope. Splitting panels across different roof faces affects how the forecast distributes generation through the day. The record does not establish as-built panel positions.

Equipment list and quoted amounts
ItemProposed detail
Solar panels40 JinkoSolar JKM425N-54HL4 modules, 425 W each, totaling 17.0 kW DC.
Hybrid invertersTwo EG4 18KPV-12LV units. The source lists 24 kW combined inverter rating; that is not a guarantee of usable backup or export power.
StorageFour EG4 PowerPro WallMount batteries at 14.3 kWh each, 57.2 kWh nominal in the quote. Usable kWh, load limits and outage runtime were not verified.
Racking hardwareFifty UFO-END-01-B1 black end-fastening components on the equipment list. The quote does not establish a field-verified hardware layout.
Base system$91,040 at the quoted cash price.
Generator line$20,000. No generator fuel, model, rated kW, transfer configuration, or performance is shown in the quote.
Total and exclusion$111,040 quoted; retailer smart meter excluded. Original quote valid through April 11, 2026. No installment schedule or payment is documented.

How did the month-by-month model work?

The proposal used 37,975 kWh of estimated annual usage and projected 23,989 kWh of PV generation, about 63% of that baseline. The table keeps estimated consumption, imported electricity and exported electricity separate. Production relative to baseline usage is not the percentage by which the electricity bill falls.

Modeled average daily generation (kWh/day, by month)
Jan40.6
Feb57.9
Mar66.9
Apr77.4
May76.5
Jun85.7
Jul80.8
Aug79.4
Sep67.3
Oct66.6
Nov48.5
Dec40.8
All monthly rows plus the rounded-row totals
MonthAverage daily generation (kWh/day)Solar generation (kWh)Baseline use (kWh)Modeled import (kWh)Modeled export (kWh)Export creditBill beforeBill afterModeled savings
Jan40.61,2592,9601,7450$0$338$208$131
Feb57.91,6222,9601,43024$0$338$174$165
Mar66.92,0741,745188399$7$208$33$174
Apr77.42,3232,760707187$3$311$91$220
May76.52,3713,6901,43631$1$410$171$238
Jun85.72,5713,8201,36115$0$444$171$273
Jul80.82,5054,6302,1990$0$534$264$270
Aug79.42,4613,8601,4950$0$449$186$262
Sep67.32,0193,5601,6180$0$415$200$215
Oct66.62,0652,080310183$3$239$50$190
Nov48.51,4542,4201,0400$0$275$130$145
Dec40.81,2643,4902,2750$0$395$265$131
Rounded rows summedNot additive23,98837,97515,804839$14$4,356$1,943$2,414

The average-daily production graph and the monthly model are separate reported series. The 12 printed generation rows sum to 23,988 kWh, one less than the 23,989 kWh summary. Bills and savings were also rounded separately in the source, so the displayed totals are not forced to reconcile.

The source only graphs long-term savings without printing each annual value. The only lifetime figure transcribed here is the explicitly labeled $70,021 modeled electricity-bill savings. No year-by-year values were inferred from bar heights.

Which assumptions matter most?

Proposal inputs and what they cannot prove
AssumptionDetail
PerformanceSystem Advisor Model 2020.02.29.r2 as named in the proposal. Total system losses: 14.4%; inverter losses: 3.1%; optimizer and shading losses: 0% in the model, not a field assessment.
Utility tariffLocation-selected NES residential rate assumptions: $0.11/kWh imported, model export credit $0.02/kWh and $20.34/month fixed charge. An account-confirmed tariff was not provided; these are not current rate claims.
Long-term calculationThe projection assumes 4% annual utility-cost growth and a 6.75% discount rate. Replacement costs outside warranty were excluded from the estimates.
Generator and outage operationThe quoted generator line does not establish how much load it could serve, what electrical integration was included or how solar and batteries would operate with it.
EvidenceUnsigned cash proposal; no signed contract, invoice, installed equipment, utility approval, maintenance history, job photos, metered production or outage results verified.

Plan backup around loads, not battery count alone

Ask for the critical circuits, expected surge loads, compatible generator details, system control during an outage, and the site's actual utility tariff. Those are different questions from the roof array's yearly energy forecast.

Request a Nashville solar and backup assessment

Source: Anonymized The Metal Roofers/OpenSolar project-specific proposal, original valid-through April 11, 2026, pp. 2–3 and 5–7. Historical figures and model, not a completed project.

A narrower battery-only quote for the same property

The archive also shows a dedicated gate-and-pump backup design for this Nashville address. It is a distinct scope, not an included add-on to the $111,040 solar-and-generator proposal. The backup-only design does not add any panels or generating capacity.

A narrower battery-only quote for the same property
Source versionBackup equipment and scopeQuoted price
Reconciled backup-only quoteSol-Ark 8K-2P inverter, about 24 kWh of lithium storage, critical-load subpanel, wiring, engineering, permit and inspection coordination. No panels, generator, trenching or electrical service upgrade.$26,785; scheduled $13,392.50, $12,053.25, and $1,339.25.
Earlier itemized backup-only quoteSame critical loads and approximate storage; individually priced labor, engineering, permitting, equipment and electrical integration. No added solar generation.$29,675 gross.
Other $26,785 copySeparate archived copy shows the same total on two milestones, not a new equipment package.$13,392.50 signing and $13,392.50 completion per this copy.
Earlier mixed-price backup draftDescribes the gate-and-pump backup at the same site. Its payment schedule sums to $21,875, while another portion still shows $26,785. It does not document a clean separate lower-price equipment option.Draft schedule $10,937.50, $9,843.75, and $1,093.75. Do not treat as a second confirmed offer.
Separate combined estimateA full estimate for the same property paired the $91,040 17 kW solar scope with the $26,785 dedicated storage and inverter package rather than the $20,000 generator line in the $111,040 quote above.$117,825 gross as printed. Not a verified payment or installed configuration.

The broader 17 kW model relates to a different solar and storage configuration and should not be applied to this battery-only scope. The draft discusses an assumed gate-and-pump load, not a measured runtime. No acceptance or payments were verified for the backup-only quote.

Sources: Anonymized site-matched gate-and-pump estimate versions, itemized scope and payment schedules, and scope/pricing from the separate combined solar-and-battery estimate. These are alternative records, not charges to add together.