Battery backup for a Nashville gate and pump
This proposal addressed two specific loads that stop when the grid goes down: a driveway gate operator and a pump. The design routes those loads through a battery-backed subpanel, without adding solar panels or promising whole-home backup.
Quoted scope, price and payments
The March 5, 2026 estimate was valid through April 4, 2026. The figures below show the original quote, not current pricing or a payment record. Site conditions and equipment selection can change the scope of a new quote.
Included
- Sol-Ark inverter, battery bank and dedicated critical-loads subpanel
- Specified wiring, conduit, disconnects, parts and installation labor
- Stamped engineering plan, Metro Nashville permit and inspections within the scope
- System programming, commissioning and a homeowner walkthrough
Not included
- Solar panels, mounting or solar wiring; generator integration
- Trenching, underground conduit, service upgrades or structural modifications
- Internet service for monitoring, smart-home integration or extended warranties
- Landscaping, drywall repair, tree trimming or other unstated work
| Milestone | Share | Amount |
|---|---|---|
| Signing | 50% | $13,392.50 |
| Completion | 45% | $12,053.25 |
| Final inspection and commissioning | 5% | $1,339.25 |
| Total quoted | 100% | $26,785.00 |
The estimate allowed approximately two to four weeks for permit approval and one to two days for the installation itself. Permit and inspection timing were not guaranteed.
What equipment was specified?
| Component | Proposal detail |
|---|---|
| Sol-Ark 8K-2P hybrid inverter | 8 kW continuous AC output and 120/240 V split-phase service. The quote lists 16 kVA for 10 seconds, 25 kVA for 100 milliseconds, 97% inverter efficiency and a nominal 4 ms automatic transfer specification. It lists two PV tracking inputs and 11 kW maximum future PV input, with no panels in this quote. |
| Battery bank | Approximately 24 kWh usable, 48 V nominal lithium iron phosphate storage. The exact battery brand, model, warranty and model-specific capacity were to be confirmed before ordering. |
| Critical-loads subpanel | Dedicated gate and pump circuits. Breakers, wire runs, connections and equipment placement are set by the site-specific electrical design. |
| Warranties as quoted | One year of installation workmanship coverage. The proposal lists a five-year standard Sol-Ark manufacturer warranty, an optional extension to ten years, and separate model-specific battery coverage once selected. |
These are the specifications printed in this estimate. This design was not a whole-home backup proposal. The transfer time is a manufacturer specification, not a measured response for either existing device.
How it was designed to work
The quote shows a conceptual diagram, not a final wiring plan. It connects the inverter and battery bank to the two chosen loads.
- Utility service
- Existing main panel
- Sol-Ark hybrid inverter
- Critical-loads subpanel
- Gate and pump
A 48 V battery bank connects to the inverter. Future solar would need a separate design and quote, including permitting and inspection as applicable.
1. Grid on
The utility supplies the gate and pump through the inverter, keeping the battery charged for a future outage.
2. Grid down
The inverter switches the dedicated circuits to the battery. Other household circuits were not included in this design.
3. Grid returns
The inverter waits for stable utility power, reconnects, and recharges the battery.
Where the 48-hour estimate comes from
The proposal assumes an average combined load of roughly 400 to 500 watts across the gate and pump. That average includes idle time and cycling. The headline figure is about 48 hours; the proposal narrative also mentions a two- to three-day range under assumptions. Neither is a measured runtime or a guarantee.
The actual runtime would depend on pump cycling, gate usage, ambient temperature, battery charge at the start of the outage and losses. The existing gate operator and pump controller both need compatibility checks. With no solar in this quote, there is no modeled solar generation, annual energy offset, or monthly bill-savings chart to reproduce.
Compare a design for your loads
Tell us what needs to run during an outage and how often it operates. A site assessment can establish whether dedicated-circuit, battery-only or solar-plus-storage backup makes sense for your property.
Request a Nashville site assessmentSource: An anonymized March 2026 The Metal Roofers estimate. Quote and design only; no installation or performance outcome is claimed.