Can a damaged solar inverter be replaced without buying new panels? In this Hendersonville case, the signed agreement called for replacing the damaged Generac inverter with a factory-new unit of the same model. The $7,993 scope also included a firmware check and getting the existing monitoring back online.

Replacement inverter under the agreement
Same-model Generac
Signed May 2025 contract total
$7,993
Limited workmanship term in the agreement
Two years

What was wrong with the existing solar system?

The scope identifies a damaged Generac inverter and refers to a tree impact. It does not describe damage to every part of the array. The repair was scoped around the inverter and existing monitoring, not a replacement array, new batteries, or added generating capacity.

  1. Before replacement

    Ask for the operating history

    The contract required the homeowner to provide monitoring data or screenshots showing that the existing solar system had operated at its rated output before the impact. That is a useful baseline for the technician. It is not proof that the rest of the system was undamaged after the impact.

  2. Replacement

    Remove the damaged unit and use the existing mounting location

    The solar team was to isolate the equipment, remove the damaged inverter for electronic-waste disposal, and install a factory-new same-model unit on the existing wall plate. The agreement does not identify the exact Generac model number.

  3. After installation

    Check firmware and restore monitoring

    The agreement included a firmware check and restoring the monitoring so the team could check operation. It does not include actual post-repair readings or a separate commissioning report.

What to save if an inverter stops working: If you can access the monitoring app from a safe location, save the error message and the last normal production readings. Have a qualified solar technician evaluate the equipment. Do not open the enclosure or attempt a restart after physical damage.

What did this inverter replacement cost?

May 2025 signed repair scope and scheduled payments
Item or milestoneAmountContract basis
Inverter replacement scope$7,993Removal and disposal of the damaged inverter, like-for-like replacement using the existing wall plate, firmware check and monitoring restoration.
Prior to installation$3,996.5050% scheduled before installation.
At completion$3,996.5050% scheduled at completion of installation.

The agreement listed a two-year limited workmanship warranty for the contractor's work. That term is separate from any manufacturer coverage for the inverter and is not a guarantee of production. This is the historical contract total for one repair, not a published rate for every Generac model.

What is verified, and what was not recorded here?

Hendersonville repair evidence and its limits
QuestionWhat the records show
Was the repair agreed to?The May 2025 repair agreement was signed. The company job record is marked Closed. The $7,993 figure is the signed contract total; it is not labeled here as the amount paid.
Was this a new solar system?No. The agreement covered replacement of a damaged inverter on an existing system. It does not document a separate array or storage purchase or an increase in capacity.
Did production return to its former level?The scope called for restoring monitoring and checking operation. We did not independently verify the pre-impact baseline, post-repair production, annual savings or an installation date from this agreement. No project photographs or production chart are presented.

For a similar repair, bring your existing equipment model, monitoring history, and any product-warranty paperwork when you request service. They help distinguish an inverter fault from a problem elsewhere in the system before anyone quotes a replacement.

Ask about solar inverter repair in Middle Tennessee

Sources: Anonymized signed May 2025 The Metal Roofers inverter replacement agreement, its scope and payment schedule, and the company job status. Historical contract, not a current quote.

The existing array before the work

This photo was added May 9, 2025, before the replacement agreement was signed.

Existing solar panels along the roof slope at the service visit
Existing rooftop solar array photographed during the Hendersonville service visit. This is not an after-repair photo.