South Carolina Solar Service Areas

Commercial Solar Installation in South Carolina

✦ ✦ ✦

The Solar Roofers designs and installs commercial solar and battery storage for South Carolina businesses, farms, churches and warehouses. Every project is planned and managed from our Nashville office at 935 E Trinity Ln #3 by a family-owned roofing and solar team working in Middle Tennessee since 2003, and the roof gets checked before anything else. Under the state's Solar Choice rates, new non-residential customers of Duke Energy and Dominion Energy South Carolina pay time-of-use rates and get per-kWh export credits, so we size each system around your daytime load. Commercial systems run 50 to 700+ kW at about $2.20 to $3.00 per watt installed.

Serving Nashville and Middle Tennessee, with projects across the Southeast
Commercial Areas We Serve

South Carolina

✦ ✦ ✦

Solar Services
State of South Carolina graphic

South Carolina Commercial Solar

What We Handle on South Carolina Commercial Projects

✦ ✦ ✦

Under Act 62, the South Carolina Energy Freedom Act, Duke Energy Carolinas, Duke Energy Progress and Dominion Energy South Carolina moved new non-residential solar customers onto Solar Choice rates starting June 1, 2021, with time-of-use pricing and per-kWh export credits. Those rates were approved for an initial five-year window, so we confirm what applies when you sign.

1

Site visit

Roof and Structure Review

We check the roof surface, the deck, the framing and how many years the roof has left, and we look at open ground for a ground mount when the roof is not the right home for panels.

2

Proposal

System Design

We size the array to 12 months of your usage and your utility's Solar Choice rate, then hand you a line-item proposal that separates solar, battery storage, roof work and electrical upgrades.

3

Paperwork

Permits and Interconnection

We pull the local permits and file the interconnection application with Duke Energy, Dominion Energy South Carolina or your local utility, and we track it until you have permission to operate.

4

Install

Installation

Our crew installs the racking, panels, inverters and any storage. When the roof needs work, we do it first, so you get one crew and one warranty for the roof and the solar.

5

Ongoing

Monitoring

We set up production monitoring and walk your team through it. If output drops or an inverter faults, our maintenance team handles the call.

Commercial Solar FAQ

South Carolina Commercial Solar Questions

✦ ✦ ✦

What does commercial solar cost in South Carolina?

Most commercial systems we build run $2.20 to $3.00 per watt installed, for arrays from 50 to 700+ kW. Larger, simpler arrays tend to land toward the low end of that range, while small systems, complex roofs and long wire runs push toward the top. Under Solar Choice time-of-use pricing, the best payback comes from solar that covers your daytime load. It is a planning range before incentives, not a quote.

What is the 2026 deadline for the 48E commercial solar tax credit?

Under the One Big Beautiful Bill Act, signed July 4, 2025, commercial solar projects that began construction after July 4, 2026 must be placed in service by December 31, 2027 to claim the 48E credit. Battery storage is not held to that solar deadline. Projects that started construction earlier may fall under different rules, so confirm your project with a tax professional before you sign.

Does my roof need to be replaced before solar goes on?

Sometimes, and we will tell you straight. A solar array lasts 25 years or more, so it should not go on a roof with only a few years left, because pulling it off for a re-roof later costs real money. Standing seam metal is ideal since panels clamp to the seams with no roof penetrations. If the roof is due, we can replace it first as one project.

How long does a commercial solar project take in South Carolina?

The paperwork usually takes longer than the build. On a straightforward job, permits and interconnection with Duke Energy, Dominion Energy South Carolina or your local utility often take 2 to 6 weeks, and larger systems or busy utility queues can take longer. We plan and manage the whole project from Nashville, install time scales with system size, and your written proposal includes the schedule. If you are aiming for the December 31, 2027 placed-in-service date, start early.

✦ Reviewed by The Solar Roofers Technical Team

Written and reviewed by the team that designs and installs our solar and battery systems, roofing Middle Tennessee since 2003. Licensed and insured · BBB A+ · Tesla Powerwall Certified Installer · TVA EnergyRight Preferred Partners Network · Reviewed October 2026