A 40 kW rooftop solar project on a working farm in Springfield, Tennessee. The USDA project record projected 51,502 kWh of electricity a year. The Metal Roofers’ job record puts the original contract at about $123,000 before incentives. The video shows the project; the numbers come from the project records, not a production meter.

Project records and film by The Metal Roofers

Two finished solar panel groups on the Baggett Farms metal roof in Springfield, Tennessee
The completed roof-mounted solar array at Baggett Farms, seen from above the entrance. · Film still, 00:25.30
Planned rooftop capacity
40 kW
Projected generation
51,502 kWh/year
Original gross contract
About $123,000
Separate USDA grant award
$61,488

The USDA figures describe a design and an award. The contract came from a separate job record. None is a meter reading or a guarantee.

What this design tells us

The grant record specifies a rooftop array. Using an existing roof leaves ground space free for the farm, but a rooftop layout has to work with the roof’s age, condition, structure and remaining service life. For a new project, we would also look at shade, equipment access and when the farm uses electricity before sizing the array. The original records do not confirm which of those factors determined Baggett Farms’ final layout.

How to read this project

  1. Start with the farm’s electricity use

    Collect 12 months of bills and, where available, interval data. A farm’s busiest months or operating hours may not be the months or hours when a roof produces the most. The grant record gives expected solar production but does not disclose this farm’s pre-installation usage.

  2. Check what the roof can support

    The project record describes a roof-mounted system. On a farm building, the design review should check roof condition, attachment points, structural and wind loads, service access and where wiring will reach the electrical equipment. The files reviewed do not establish the exact attachments or electrical equipment used here.

  3. Size the array and model the output

    The USDA award describes a 40 kW system with 51,502 kWh of projected annual production, or about 1,288 kWh per kW of capacity in the model. The first number is capacity. The second is the energy the system was expected to produce over a year, not a utility-bill credit.

  4. Separate the contract from financial assistance

    The original contract was about $123,000. USDA’s separate $61,488 grant figure was an award, not the job price and not proof of funds paid. A commercial quote should show the gross contracted amount before any applicable incentives, then list assistance and its assumptions separately.

  5. Compare the projection with actual readings

    After commissioning, the useful comparison is monthly meter or inverter production versus the design estimate, along with how much of that energy the building used. We did not verify monitored production, final equipment or the farm’s actual bill savings for this story.

A closer look at the project

Watch the project film

Open the project video on YouTube

Questions to ask about a project like this

How big was the Baggett Farms solar system?

The USDA project award lists a 40 kW rooftop system for Baggett Farms in Springfield, Tennessee. That is the planned system rating; the final equipment schedule was not independently verified for this story.

How much electricity was the system expected to produce?

The USDA project record projected 51,502 kWh a year. That is an estimate, not metered output and not a percentage of the farm’s electricity use.

What did the farm solar project cost?

The Metal Roofers’ archived job record shows an original contract of about $123,000, before incentives. USDA separately announced a $61,488 grant award. Neither figure establishes the farm’s final out-of-pocket cost or a current price.

Can a farm use rooftop solar without giving up usable ground?

Yes, when an existing roof is suitable and the layout meets structural, electrical and access requirements. A ground mount is worth comparing if the roof is shaded, nearing replacement or constrained by roof geometry.

What percentage of Baggett Farms’ electricity did solar cover?

That percentage was not verified. To calculate it, compare measured generation and interval usage, and distinguish energy the farm used directly from energy exported to the grid.

Sources and evidence

Plan your own project

Let’s look at your roof and your power use.

Bring a year of electric bills, any roof work you have planned and the loads you want to keep running. We can talk through rooftop vs. ground mount, array size and whether storage belongs in the plan.

Request a solar consultation